Fisherman's Terminal

 

Eureka, California
Owner: City of Eureka, California
Services Rendered: Pile Driving, Industrial Docks

Project Description

This project, for the City of Eureka, involved the demolition, removal and disposal of existing timber wharf, building structures, floating dock, ramp, piling, timber building, concrete foundation, concrete curbs, sidewalks, driveways, pavement, utilities, and refuse. New construction included 424 ft. of concrete wharf/boardwalk with jib cranes, lighting and railing, concrete piles, fender and guide piles, street architectural items and pedestrian access corridor improvements, floating dock and gangway, and steel sheet pile wall. Additional work included earthwork and grading, petroleum hydrocarbon-contaminated soil and groundwater handling and disposal, concrete curbs, sidewalks, pavement, lighting, water, storm drain, electrical utilities, fencing and gates, as well as, landscaping and site amenities. This project was successfully completed in February 2006.